'Zenith'

'Zenith'

Wednesday 21 July 2010


The studio build has commenced! After a quick trip to HSS hire that is. Turns out my cheap Argos drill just doesn't cut it when attempting to drill into brickwork, so one hefty hammer action drill later and we have progress. Aided by my glamorous (and somewhat stronger and taller) assistant Rob, who turned into Superman for the evening, we now have wall batons and floor beams in place, and very sturdy they are too I might add.
For clarity I attach a before image in which you can see the other artist's spaces on either side of me, and may understand why I want to build walls to keep it all out. We're based in an old factory, which in fairness as with so many of these type of place, has seen better days, in that the walls and ceiling are a bit worse for wear, but it contains twenty five very nice arty types and I'm very much looking forward to moving in officially.

Today = day of rest, both for me and Rob, who in fairness has done most of the hard work so far, except he was at work when the delivery guys arrived with all the wood and panelling. We had to shift it all up 25 steps to get it in. They weren't happy. They were sweaty and red faced.
And so was I.

Still onwards and upwards, for tomorrow it continues. We should actually see some walls appearing all going well.
Til then.......

No comments:

Post a Comment